A demonstration of what can be accomplished visually through CSS-based design. Select any style sheet from the list to load it into this page.
Telephone: 01243 544421 • Fax: 01243 544422
Most sites are levelled by 'Cutting and Filling' which keeps soil disposal to a minimum. This is carefully supervised to ensure proper consolidation of made up ground. The formation will normally be left with a uniform fall to the lay of the land of approximately 0.75% to assist in the dispersal of water. The total depth of the court is 150. Clean crushed limestone aggregate is normally used, but other suitable materials many be used where limestone is not readily available. A selection of surface types are available, most of which are porous and all weather. Tennideck has proven to be the most popular surface for many years.
